Chico Demolition
Permit Guide

City of Chico permits and Butte County permits are different tracks, and the air district is a separate step. We figure out the jurisdiction and handle the required demolition permits.

Planet Demolition crew and machinery on a jobsite
California C-21 License #1138196

C-21 Licensed, Bonded, and Insured

Written Itemized Estimates

Hauling and Legal Disposal

Clear Project Communication

Planet Demolition determines the correct jurisdiction. If the address is inside City of Chico, the City of Chico Building Division / Community Development is the building-permit agency. If the parcel is unincorporated Butte County, Butte County Development Services reviews the permit.

What building departments typically want

Demolition or building permits for structure removal commonly ask for owner information, a description of what comes down, utility disconnect proof, and whether hazardous materials have been addressed. Exact forms, submittal portals, and fees change. We check current requirements with the appropriate agency and outline project costs in your proposal.

Air district, not the building counter

Butte County Air Quality Management District (BCAQMD) handles dust and asbestos-related demolition notifications that are separate from the city or county building permit. A green building permit does not automatically mean the air district is satisfied.

Specialist coordination

Asbestos surveys are performed by licensed consultants, not by Planet Demolition. We do not perform hazardous-material abatement, but can coordinate an appropriately licensed contractor when it is required. We handle necessary utility disconnections with utility providers and qualified trades. The written proposal outlines the scope and costs, including testing and third-party abatement. Crews mobilize from Grass Valley.

Related: pool removal in Chico, commercial demolition in Chico, fire-damage demolition in Chico.

Frequently Asked Questions

Do I need a demolition permit in Chico?

Yes. Properties inside Chico city limits get demolition permits from the City of Chico, and parcels outside the city go through Butte County. Butte County AQMD rules apply to asbestos. Planet Demolition confirms the agency for your address and handles the permit as part of the job.

Do I need a permit to remove a pool in Butte County?

Yes, in most cases. Our 2025 Chico pool removal was done under a Butte County permit with an inspection, and we photographed the drain puncture and drainage trench for the record. We handle the permit and inspection scheduling. Inside Chico city limits, the City of Chico issues the permit instead.

What paperwork helps if the property had fire damage?

Share any county or state debris program records, testing reports, insurance instructions and photos. They show what was already cleared and what remains, which helps the permit and the demolition scope match the property's history. If you are unsure what records exist, the county can tell you what was filed.

Who handles the demolition permit for a Chico project?

Planet Demolition does. We determine whether the City of Chico or Butte County has jurisdiction, file the application, coordinate PG&E disconnects and schedule inspections. Your written proposal lists the permit work. Air district notices with Butte County AQMD are coordinated when they apply, too.

Planning demolition in Chico?

Request a bid. We handle required demolition permits and will discuss the city or county jurisdiction for your property.

CSLB #1138196 · Serving Chico, Roseville, Sacramento, Yuba City, and Auburn from Grass Valley