Interior Demolition
in Northern California
Interior demolition is a kitchen, a bath or a full gut, with the rest of the building protected. You get a written scope and the debris hauled away.

How we gut a space
A home remodel and a retail strip-out need the same care: a clear scope, dust control and protection for what stays. We bid that in writing.
In Sacramento, older homes in East Sacramento and Land Park bring plaster walls and materials that may contain asbestos. Yuba County and the foothills add flood-damaged and storm-damaged homes. Testing and the right air district notification come before demolition, and we coordinate licensed abatement when needed. Most Roseville homes are on Roseville Electric, which affects circuit isolation. Our C-21 crews travel from Grass Valley with a written schedule.
In the valley, see interior demolition in Roseville and interior demolition in Sacramento, or our demolition company in Roseville page for everything else we handle there. Older buildings may need asbestos testing before demolition.

Types of Projects Covered
Kitchen & Bath Gutting
Removing old cabinets, tile, drywall, and fixtures safely.
Whole-House Strip-Outs
Complete interior gut downs down to the studs.
Tenant Improvements
Commercial interior demolition for office remodels.
Retail & Office Clear-Outs
Stripping out finishes from storefronts and work spaces.
Typical Scope of Work
We gut the rooms listed in your bid, from a kitchen or bath to a full interior, and haul the debris. What stays is protected, and any required testing is coordinated before we start.
Note: Exact inclusions are determined by the written proposal.
Site Protection and Dust Containment
Protecting the remaining structure is our priority. Dust containment barriers, floor protection (Ram Board or similar), and safe debris-handling routes are established when specified in your written proposal.
We handle required demolition permits and necessary utility disconnections, coordinating with utility providers and qualified trades as needed.
Testing for materials such as asbestos or lead may be required. Planet Demolition does not perform hazardous-material abatement, but can coordinate required abatement with an appropriately licensed contractor before demolition.
Your written proposal outlines project scope and costs, including any testing, third-party abatement and permit fees.
Demolition Process
Site Walk
We identify what stays, what goes, and the required access routes.
Written Estimate
You receive an itemized proposal detailing exactly what is included in the scope.
Preparation
Floor protection and dust containment are installed per the proposal.
Execution
Methodical interior removal, loading, and hauling.
Final Review
Site is swept clean and turned over for construction.
Frequently Asked Questions
Do you need a permit for interior demolition?
It depends on the work. Removing cabinets, flooring or drywall often needs no separate permit, but taking out walls, plumbing, electrical or structural elements usually falls under a building permit, and some agencies ask for an asbestos declaration. We check with your city or county and work under your remodel permit or handle the demolition permit.
What is a full interior gut?
A full interior gut removes everything inside the shell down to the studs and slab or subfloor: drywall, flooring, cabinets, fixtures, insulation, ductwork and wiring. The framing, exterior and roof stay. On a 1,346 sq ft home in Olivehurst, we gutted the interior to studs and bare slab while the siding and main roof stayed in place.
How much does a full interior gut cost?
Full-gut interior demolition generally runs about $6–10 per square foot, but that is a broad range. Size, finishes, what stays, access for hauling debris through a lived-in home, permits, asbestos or other hazmat testing, and haul-off all change the price, so a free on-site estimate is the only real quote. Send plans or photos of the rooms coming out for a free written, itemized bid.
How long does interior demolition take?
A single bathroom or kitchen tear-out is often done in a day or two, while a whole-house gut takes longer depending on size, materials and how debris leaves the building. Asbestos testing on older finishes can add time before work starts. We give a schedule with the written estimate so your remodeler can plan the next trade.
How do you control dust during interior demolition?
We isolate the work area with plastic barriers, cover floors and doorways that stay, and keep a clear path for debris out of the house. Dust is managed with water where appropriate and cleanup as we go. If people are living in part of the home, tell us which rooms must stay usable so we plan the protection.

Planning an Interior Demolition?
Get a professional, itemized estimate for your interior demolition project. Licensed, bonded, and insured team ready to clear your site.


