Selective Demolition
in Roseville

Selective demolition is for jobs where most of the building has to stay. We mark exactly what comes out, protect the rest and turn the space over to your builder.

Selective demolition project in progress
California C-21 License #1138196
Licensed, Bonded, and Insured
Written Itemized Estimates
Hauling and Legal Disposal
Clear Project Communication

How selective demolition works

A retail suite and a home addition need the same thing: a written scope, careful cuts and protection for everything that stays. We bid that level of care.

Most Roseville properties buy power from Roseville Electric rather than PG&E, which affects how we coordinate isolating circuits in areas being removed. Selective work is about restraint and planning, and we document removal limits clearly so nothing comes out that was meant to stay. We do the same work in Sacramento, Rocklin, Auburn and Yuba City.

Selective dismantling of building sections

Types of Projects Covered

Building Additions

Surgical removal of wings or additions from main structures.

Exterior Façades

Stripping off old exterior materials for renovations.

Targeted Interiors

Removing specific walls and architectural changes safely.

Structural Modifications

Engineered removal of components like supports and decking.

Typical Scope of Work

We remove the partitions, ceilings, storefronts, additions or other elements listed in your bid, and we protect the structure that stays. The scope is written before work starts.

Targeted material removal
Establishment of separation lines
Mechanical and manual dismantling
Preservation of remaining structures
Site protection setup
Debris hauling and disposal

Note: Exact inclusions are determined by the written proposal.

Site Protection and Utilities

Isolating the work zone is critical. Site protection measures and dust barriers are outlined in your written proposal. We handle required demolition permits and necessary utility disconnections, coordinating with providers and qualified trades as needed.

Testing for materials such as asbestos or lead may be required. Planet Demolition does not perform hazardous-material abatement, but can coordinate required abatement with an appropriately licensed contractor before demolition.

Your written proposal outlines project scope and costs, including any testing, third-party abatement and permit fees.

Demolition Process

01

Site Walk

We identify the exact boundaries of the demolition zone.

02

Written Estimate

You receive a clear, itemized written proposal detailing the targeted removal.

03

Preparation

Establishing separation lines, utility isolation, and installing site protection.

04

Execution

The controlled teardown, loading, and hauling of debris.

05

Final Review

Site turnover ensuring the preserved structures remain intact.

Frequently Asked Questions

What is selective demolition?

Selective demolition removes specific parts of a building, such as a wall, a kitchen, a bathroom, an addition or old finishes, while protecting the rest of the structure. It is common before remodels and tenant improvements. Planet Demolition marks what stays, protects adjacent finishes, and removes and hauls only the work listed in your written scope.

What is soft strip demolition?

Soft strip demolition, or soft demolition, removes non-structural items such as fixtures, cabinets, flooring, ceilings, drywall and insulation before a remodel or a full teardown. It leaves the frame and structural elements in place. Soft strip also helps separate recyclable materials from mixed debris, which can support construction and demolition recycling requirements.

Can you remove an interior wall during a remodel?

Yes, once your designer or engineer confirms whether the wall is load-bearing and what replaces it. We remove the drywall, framing and trim, and we make sure plumbing and electrical in the wall have been disconnected by the right trade first. Bearing walls need temporary support and a permit, so share your plans before we bid.

Can you protect finishes in rooms next to the demolition area?

Yes. We set up barriers, floor protection and a defined debris path so adjacent rooms, cabinets and floors are not damaged. Tell us what must stay untouched, such as new flooring or built-ins, and we will plan the protection before work starts and note it in the written scope.

Planet Demolition cleanup operation

Planning Selective Demolition?

Get a professional, itemized estimate for your selective demolition project. Licensed, bonded, and insured team ready to clear your site.

CSLB #1138196