The teardown is often the short part. Permits, surveys and utility disconnects usually take longer, and those steps set the real calendar.

Planet Demolition crew and machinery on a demolition jobsite
California C-21 License #1138196

C-21 Licensed, Bonded, and Insured

Written Itemized Estimates

Hauling and Legal Disposal

Clear Project Communication

House demolition in Chico, Roseville, Sacramento, Yuba City, or Auburn does not start the morning you call. It starts when the parcel jurisdiction, surveys, utilities, and written scope are ready. Field demolition for a typical house is often measured in working days, not months, once those items are done. We still will not print a fake average.

What happens before the first machine day

Preparation starts with a walk-through, a written estimate, and decisions on foundations and salvage. Planet Demolition handles required demolition permits and necessary utility disconnections, coordinating with providers and qualified trades. Testing or air-district notifications may be required. We do not perform hazardous-material abatement, but can coordinate an appropriately licensed contractor if needed. Any of these steps can affect the schedule; your proposal outlines the scope and costs.

What happens on site

Soft strip if contracted, structure take-down, loading, legal disposal, then slab or footing work only if written. Cleanup matches the proposal. Import fill and compaction are not automatic.

What stretches the calendar

Narrow infill lots, Auburn grade, shared driveways, incomplete disconnects, and late surveys. Interior-only jobs and full house jobs are different calendars. See house demolition, city house pages, and the preparation checklist.

Frequently Asked Questions

How long does it take to tear down a house?

Field demolition of a typical house is usually measured in days once it starts. The longer part is before: permits, any asbestos survey, and utility disconnects can take weeks. PG&E does not publish a fixed timeline for permanent disconnects, so we start that early. Your written proposal lays out each step.

How long does it take to get a demolition permit?

It varies by agency and by what the permit needs, such as an asbestos survey, utility disconnect confirmation or historic review. In Sacramento, our garage job needed a historic review before the city issued the permit. We apply as soon as the contract is signed.

Can demolition start while utility disconnects are pending?

No. Electric and gas must be permanently disconnected before the structure comes down. We can plan the job and set a target date while disconnects are pending, then lock the start date once the utility confirms the work. Water and sewer must also be shut off and capped as the agency requires.

How long after demolition can I start building?

Your builder can usually start once demolition is finaled and the site is handed over as written. Tell us early what they need, such as foundation removal or backfill, so we schedule a clean turnover. Your builder will also need their own building permit issued, so apply in parallel with the demolition.

Want a schedule that matches your house?

Request a bid. We will talk through clearances and field time after we see the structure and the haul path.

CSLB #1138196 · Serving Chico, Roseville, Sacramento, Yuba City, and Auburn from Grass Valley